Skip to content
Urban Solutions
Parc des Écluses pavilion

Parc des Écluses pavilion

Town of Rivemont

The jobArchitecture · Rivemont · 2025

At the edge of the canal, the town wanted a shelter that would stand up to winter without closing off the view.

We drew a frame of square steel tube, bolted to a concrete slab and topped with folded, perforated aluminum panels that let light and meltwater through. A red screen cuts the wind off the water, with two steel-and-wood benches set against it. Everything was built and powder-coated in the shop, then assembled on site in two days.

5 mPerforated aluminum roofSteel tubeWind screenSlab

How it was made

  • 01 · DrawnFrame and folded panels, in house
  • 02 · BuiltSquare tube cut and welded in the shop
  • 03 · CoatedPowder coat, cured in our own tunnel
  • 04 · InstalledBolted to the slab in two days

The facts

  • ClientTown of Rivemont
  • Footprint5 × 5 m
  • MaterialsSteel, perforated aluminum
  • Assembly2 days on site

Need a price? Get in touch.

Tender, price request, architectural project or one-off part. Send it through the form or call the shop.

HoursMonday to Friday, 8:00 – 16:00
Your contactTony Randazzo, co-founder