
Parc des Écluses pavilion
Town of Rivemont
The jobArchitecture · Rivemont · 2025
At the edge of the canal, the town wanted a shelter that would stand up to winter without closing off the view.
We drew a frame of square steel tube, bolted to a concrete slab and topped with folded, perforated aluminum panels that let light and meltwater through. A red screen cuts the wind off the water, with two steel-and-wood benches set against it. Everything was built and powder-coated in the shop, then assembled on site in two days.
How it was made
- 01 · DrawnFrame and folded panels, in house
- 02 · BuiltSquare tube cut and welded in the shop
- 03 · CoatedPowder coat, cured in our own tunnel
- 04 · InstalledBolted to the slab in two days
The facts
- ClientTown of Rivemont
- Footprint5 × 5 m
- MaterialsSteel, perforated aluminum
- Assembly2 days on site

Need a price? Get in touch.
Tender, price request, architectural project or one-off part. Send it through the form or call the shop.








